Part of the RTO Radar compliance ecosystem
Risk register software for Australian RTOs
A live, calculated risk register that does more than record risks — it drives validation frequency, sets industry consultation cadence, prompts treatments and gives leadership a single defensible view of compliance exposure.
What's included
Every capability is designed for compliance teams who are short on time and need evidence on demand.
Organisational and course-level risk
Track risks across the whole RTO and per qualification using a matrix designed for the Standards for RTOs 2025.
Dynamic risk scoring engine
Basic provider factors and comprehensive risk factors combine into a calculated score that updates the moment inputs change.
Treatments and consolidated controls
Each risk has a dual Title/Description structure with consolidated controls, owners, deadlines and evidence. Nothing falls through.
Drives validation and consultation frequency
Course risk scores set how often each unit is validated and how often industry consultation must occur — no manual scheduling required.
Decimal-precision versioning
Every change is versioned to numeric(10,1) precision with full author attribution, so risk history is defensible during ASQA review.
Linked to QMS controls and CI
Controls reference the controlling QMS document, and emerging risks or treatment actions flow into the continuous improvement register.
How Risk Register fits the rest of RTO Radar
Risk Register doesn't sit on its own. Evidence flows where it needs to go, so nothing is re-keyed and nothing is lost.
Frequently asked questions
Explore the rest of the ecosystem
Every module is built to work with the others — evidence flows in, audit trail flows out.
Validation
Plan, run and evidence unit validation aligned to SRTO 2025.
Assessment Judgement
Run defensible assessment validation with AI guidance, summary reports and a 1:1 CI loop.
Continuous Improvement
A CI register that captures, tracks and evidences improvement across the RTO.
Training Products Management
Build and maintain Training and Assessment Strategies with master-cohort architecture.
QMS & Documents
Document control with manual standards mapping to SRTO 2025 and VRQA frameworks.
PD & Trainer Compliance
Trainer matrices, PD planning and currency evidence in one workforce view.
Feedback & Complaints
Complaints, feedback and industry consultation feeding continuous improvement directly.
Standards for RTOs 2025
Plain-English pillar guide to SRTO 2025, mapped to every module.
See Risk Register in your RTO
Book a 60-minute walkthrough with the RTO Radar team.